Shopping from outside the UK?Visit our US site ($)Visit our EU site (€)

Outdoor kitchen installers,
without the building site.

Most outdoor kitchen installers in the UK quote six to twelve weeks of on-site building. A PoshBBQ pod arrives fully assembled on one pallet and is craned into position in a single day — the only “installation” left is plugging in power and cold water.

The contrast

Nine weeks of trades, or one afternoon.

Traditional install

Footings, blockwork, render, cladding, appliance fitters, electricians, plumbers — six to twelve weeks of trades in your garden, weather permitting, with the budget creeping as it goes.

The PoshBBQ way

One pallet, one forklift, one mini-crane. The pod lands on your prepared patio fully built and tested. An electrician and a plumber connect it in half a day each. You cook that evening.

And if you move house?

A built-in outdoor kitchen stays behind. A pod cranes back out and comes with you — it is an asset you own, not a fixture you leave.

Questions

Answered, briefly.

Do I need outdoor kitchen installers for a PoshBBQ pod?

Not in the traditional sense. The pod arrives fully assembled; our delivery team forklifts or cranes it into position the same day. You only need an electrician for the 13-amp supply and a plumber for the cold-water feed — typically half a day each.

How is a pod different from an installed outdoor kitchen?

A traditional installed outdoor kitchen is built on site over weeks: footings, blockwork, cladding, appliance fitting. A pod is manufactured complete, delivered on one pallet, and working the day it lands.

What groundwork is needed before installation?

A flat, level base that can take the weight — an existing patio or a simple slab. Our site-prep guide covers exactly what to prepare; most gardens need nothing new.

Do you install across the whole UK?

Yes — we deliver and position pods UK-wide, from Cornwall to the Highlands, using forklift and mini-crane offload. Delivery is included in the starting price.

How long does installation take?

The offload and positioning takes a few hours. Connecting power and water is typically done the same week by local trades. Most owners are cooking the same day the pod lands.

Yours next?

Installed in a day, cooking by dinner.

Tell us about your garden and we’ll send a quote, delivery date and site-prep checklist within two working days.